- Overview
- floor plans
- Specifications
- Amenities
- Availability
- Location
- Current status
Basic Details
Land Extent : | 67.38 Cents |
No.of Floors : | G+ 13 |
Total Flats : | 75 |
Type: | 2 Bhk ( 922 Sq.ft ,936 Sq.ft , 945 Sq.ft ) 3 Bhk (1136 Sq.ft, 1226 Sq.ft,) 5 Bhk Duplex ( 2451 Sq.ft) |
Contact
More Details : 98471 98472
PVS CLASSIC
Kannur is a magnificent miniature of the picturesque state of Kerala, a place with a resonant past, myths and legends around. The cradle of many colourful folk art and music, Kannur is said to be the ancient port of Naura. The district itself which shares much of the natural grandeur has been a key contributor to the cultural, religious, political and industrial legacy of the state. Kannur before the country's independence had its social, political and cultural life shaped up by the local rulers,foreign trade links as well as the imperial powers like the Portuguese and the British.
With the western ghats in the east, Kozhikode & Wynad districts in the south, Arabian sea in the west and Kasaragod district in the north, Kannur district is bounded by a wealth of natural charm. Blessed with natural beaches, hill stations, rivers, backwaters, historical monuments and religious centres kannur was hailed by the celebrated traveller Marco Polo as the great emporium of the spice trade.
The PVS Classic site which spreads over an area of 67.38 cents is located at Chala - a census town situated 8 K.M from Kannur City which lies on the Kannur - Tellicherry National Highway.
The predominant wind direction is from south west to north East. Sloping terrain with a striking view to the captivating beauty of Chala, the plot satisfies the needs of the site to design an apartment which is both appealing and site specific.
BUILDING PERMIT NO :BA NO - C/8205/15 DATED 01/06/2017
Registration Number: K-RERA/PRJ/087/2020
Quick Enquiry
FLOORING
- High quality vitrified flooring
- Anti –skid ceramic floor/wall tiles in bathrooms .Wall tiles up to false ceiling height
KITCHEN
- Granite kitchen counter with Glazed tile dado up to 2 feet
- Stainless steel sinks with drain board
- Water purifier point & Adequate power points in kitchen
- Provision for washing machine
CIVIL
- Civil-All RCC works as per IS: 456
- All outside wall are in laterite masonry/cement block
- Inside walls in single brick masonry/cement block
DOORS & WINDOWS
- Hardwood main door with safety chain, peep hole & decorative handle.
- All door frames in hardwood
- All inside door shutter of moulded skin type
- Powder coated aluminium windows with MS grill
- High quality joinery & accessories
PAINTING
- Internal walls finished with emulsion
- External walls with exterior emulsion
ELECTRICAL
- 3 Phase connection with independent KSEB meters for each apartments
- Concealed wiring using PVC conduits
- Provision for TV & telephone in living room
- 24 hr stand by generator for elevators, common area & essential lights in each flat restricted to 500W
- Electrical provision for A/c in Master Bed room
- Electrical & plumbing provision for wall mounted geyser in Master bedroom toilets
SANITARY FITTINGS
- Branded white sanitary wares
- Branded CP bath fittings with shower, towel rod & soap dish .
WATER SUPPLY
- From ground water source and KWA water through sump and over head tank.
SECURITY / SAFETY FEATURES
- Surveillance camera in the ground floor common area
- All round compound walls surrounding the community
- Standard fire safety features
RECREATION
- Caretaker's room
- Association room
- Library room
- Home theatre
- Fitness centre
- Indoor games
CONVENIENCE
- High speed Elevators
- Common toilet
- Sewage Treatment Plant
- Car parking for all flats
- Provision for TV in living room
- Intercom facility
- Provision for Broad band internet connectivity
- Provision for telephone in living room
- Electrical provision for A/C in Master Bedroom
- 24 hr stand by generator for elevators, common area & essential lights in each flat restricted to 500W
PVS Classic, Chala Hills, Kannur
4 Available |
1 Reserved |
70 Sold |
Floor | Type A | Type B | Type C | Type D | Type E | Type F |
1 | Sold | Sold | Available | Sold | Sold | Sold |
2 | Sold | Sold | Reserved | Sold | Sold | Sold |
3 | Sold | Sold | Available | Sold | Sold | Sold |
4 | Sold | Sold | Sold | Sold | Sold | Sold |
5 | Sold | Sold | Sold | Sold | Sold | Sold |
6 | Sold | Sold | Sold | Sold | Sold | Sold |
7 | Sold | Sold | Sold | Sold | Sold | Sold |
8 | Sold | Sold | Sold | Sold | Sold | Sold |
9 | Sold | Sold | Sold | Sold | Sold | Sold |
10 | Sold | Sold | Sold | Sold | Sold | Sold |
11 | Sold | Sold | Sold | Sold | Sold | Sold |
12 | Available | Sold | Sold | Sold | Sold | Sold |
13 | Sold | Available | Recreation | Recreation | Sold |
![PVS CLASSIC](https://pvsbuilders.com/wp-content/uploads/2017/07/LOCATION-MAP-PVS-CLASSIC.jpg)
Easy Access
Chinmaya vidyalaya | 500 m |
Railway station | 3.3 km |
Proposed airport | 26 km |
Govt.Polytechnic | 3.7 km |
S.N. College | 3.2 km |
Genesis super speciality hospital | 2.1 km |
Sadhoo merry kingdom (amusement park) | 1.5 km |
Places of worship | 600 m to 2.8 km |
Locate Us
![YARD SOUTH SIDE [30-09-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Yard-south-side-z944onrfqfzhu17xr7avb4.jpg)
![VISITORS LOUNGE [30-09-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Visitors-lounge-z944mbkryevbtj3totfk00.jpg)
![GROUND FLOOR LOBBY [30-09-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Ground-floor-lobby-1-z944l7daosb2i08ufm9qf4.jpg)
![LIBRARY [30-09-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Library-z944k6xinxqgjxs0qenkzk.jpg)
![NIGHT VIEW [30-09-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Night-view-z944dcnpeh1dgur9skafb4.jpg)
![CHILDREN'S PLAY AREA [30-09-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Childrens-play-area-2-z944btdf5qiinibobexx4w.jpg)
![LANDSCAPE [30-09-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Landscape-1-z9447lc4zpknwt4s998j5s.jpg)
![EAST SIDE ELEVATION [30-08-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/East-side-elevation-2-z94425boba2wh4ordwtngg.jpg)
![NORTH SIDE ELEVATION [30-08-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/North-side-elevation-4-z9440namhgvxg9pvrfbpc0.jpg)
![INTERLOCK WORK IN PROGRESS [30-07-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/PHOTO-2023-09-14-11-06-47-z943ydmfjafj0qj7ed5i4g.jpg)
![TERRACE FLOOR - ROOF TOP [30-06-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Terrace-floor-rooftop-z360868l5486v1qc7wu1og.jpg)
![HOME THEATER [30-06-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Home-theatre-z3606go4tr1x39z5hg8r9c.jpg)
![CHILDREN'S PLAY AREA [30-06-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Childrens-play-area-1-z3604arn4cl6176modm874.jpg)
![ASSOCIATION ROOM [30-06-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Association-room-z3602wiajbdudslwlvny80.jpg)
![RECREATION ROOM [30-06-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Recreation-room-1-z36014fde3jt11xa63djpc.jpg)
![INTERLOCK PAVING IN PROGRESS - WEST SIDE [30-06-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Interlock-paving-in-progress-west-side-z35zyjg2pl4gh5k552kc1s.jpg)
![SOUTH SIDE ELEVATION [31-05-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/South-side-elevation-1-z35z85jd9nkuaeh988vaps.jpg)
![LANDSCAPER [31-05-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Landscape-z35z6ihds52c3lni73z4e8.jpg)
![INTERLOCK PAVING IN PROGRESS [31-05-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Interlock-paving-in-progress-z35z4ckw2qll1iuze1clc0.jpg)
![CHILDREN'S PLAY AREA [09-05-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/WhatsApp-Image-2023-05-09-at-2.02.34-PM-yzhw9jscb2shkmfnej8mps.jpeg)
![ELEVATION [09-05-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/WhatsApp-Image-2023-05-09-at-2.02.33-PM-yzhw78uwxz07cls96t7vgg.jpeg)
![INSPECTION FOR FINAL FIRE NOC HELD ON 28-04-2023](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Inspection-for-Final-Fire-NOC-held-on-28-4-2023-yzhuosqa5o2kztc0hd32f4.jpg)
![CHILDREN'S PLAY AREA [30-04-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Childrens-play-area-scaled-yzhufm9t469bw875h4ulfk.jpg)
![STP PLANT ROOM [31-03-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/STP-plant-room-scaled-yzhu2fbge7hisunpiq02rk.jpg)
![SOUTH SIDE ELEVATION [31-03-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/South-side-elevation-yzhtre9ldn6grjwsdds35s.jpg)
![INSTALLATION IN STP PLANT ROOM [28-02-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Installation-in-STP-plant-room-scaled-yzhsvbjscstwlq4umkq9s0.jpg)
![JET BLACK GRANITE COUNTER IN KITCHEN [28-02-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Jet-black-granite-counter-in-kitchen-scaled-yzhsrl3rzqiextg0howohs.jpg)
![LIFT CLADDING IN 12TH FLOOR SCALED [28-02-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Lift-cladding-in-12th-floor-scaled-yzhsfpwb0ya5wvjuwgbbpc.jpg)
![DP STRUCTURE INSTALLED BY KSEB [31-01-2023]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/DP-structure-installed-by-KSEB-yufwdmyh7fnd1m2lacwzk0.jpg)
![NORTH SIDE ELEVATION : 31-01-2023](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/North-side-elevation-3-yufw8xbx8g3584dnaxbsw0.jpg)
![DUCT DOOR FIXING IN BALCONY [31-12-2022]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Duct-door-fixing-in-balcony-scaled-ywwwfhx6uop0acoah7ljb4.jpg)
![FIXING OF INTERNAL DOOR SHUTTERS [31-12-2022]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Fixing-of-internal-door-shutters-scaled-ywwwfcw96zdh4etf2k7b40.jpg)
![YARD WORK IN PROGRESS [30-11-2022]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Yard-scaled-ywwwft8al0nyepur568jr4.jpg)
![DG SET [30-11-2022]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/DG-set-yufxns1hbe0t2xzxa518u8.jpg)
![FIRE STAIRCASE TILING WORK - 12TH FLOOR [30-11-2022]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Fire-staircase-tiling-12th-floor-scaled-ywwwgc2sswm79ztix3ywhs.jpg)
![ELEVATION : 31-10-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/View-from-approach-road-1-ynnfs8i6ae3y4ceci5mxhc.jpg)
![NORTH SIDE ELEVATION : 31-10-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/North-side-elevation-2-ynnfpjr6d3oy6zn1x5a1og.jpg)
![WEST SIDE ELEVATION : 31-10-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/West-side-elevation-2-ynnfnwp6vl6g06taw0dvcw.jpg)
![EAST SIDE ELEVATION : 31-10-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/East-side-elevation-1-ynnfmc5o7xbpecwzk76t4w.jpg)
![CAR PARKING FOOTING WORK IN PROGRESS : 30-09-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Car-parking-footing-work-in-progress..-ylwnf1k0ttfhwhrypytgqo.jpg)
![SOUTH SIDE ELEVATION VIEW : 30-09-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/South-side-ylwndks7exkeo49sy562o0.jpg)
![NORTH SIDE : 30-09-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/North-side-1-ylwnatiqnshn5sl2nt42rk.jpg)
![SECURITY CABIN WORK IN PROGRESS : 30-09-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Security-cabin-work-in-progress..-ylwn8jujpm18q9eeaqxvk0.jpg)
![WEST SIDE ELEVATION : 31-08-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/West-side-elevation-ykyagche5u3gq7a9f3vvgg.jpg)
![WEST SIDE COMPOUND WALL : 31-08-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/West-side-compound-wall-ykyabbjqgikasceurpnocg.jpg)
![NORTH SIDE - ELEVATION : 31-08-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/North-side-yky9yjo6pnr36sg118zu9s.jpg)
![WEST SIDE ELEVATION VIEW : 31-07-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/West-elevation-yhj1j0byns0nteztjoiups.jpg)
![RAIL FIXING FOR PLUMBING RINGMAIN IN TERRACE FLOOR : 31-07-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Rail-fixing-for-plumbing-ringmain-in-terrace-floor-yhj1esaohr2t2psxhitgqo.jpg)
![NORTH SIDE ELEVATION VIEW : 30-06-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/NORTH-ELEVATION-yhj1ak9ebq4yc0m1fd42rk.jpg)
![EAST SIDE COMPOUND WALL : 30-06-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/EAST-SIDE-COMPOUND-WALL-yhj14z7zzlbnqeb55dayv4.jpg)
![FLOORING WORK IN PROGRESS : 30-06-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Flooring-work-in-progress-yhj12oakmhjdidnqxna7ls.jpg)
![VIEW FROM APPROACH ROAD : 31-05-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/View-from-approach-road..-ydl4ydza950r93c8cgs3cw.jpg)
![ELEVATION : 31-05-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/North-side-elevation-1-ydl4s6bogc9keqoeqjoykg.jpg)
![FLOORING WORK IN PROGRESS : 31-05-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Flooring-work-in-progress..-ydl4n0d33bevaxy4oi2j9c.jpg)
![INSTALLATION OF PASSENGER LIFT IN PROGRESS : 31-05-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Installation-of-13-passenger-lift-in-progress-ydl4klnyhfmxpgwkwsi3uo.jpg)
![KERB IN KITCHEN : 31-03-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Kerb-in-kitchen-scaled-ywwv3r1fo54xupdxayfnr4.jpeg)
![RANDOM RUBBLE MASONRY AT SOUTH SIDE : 31-03-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Random-rubble-masonry-at-south-side-scaled-ywwv3kr9lihiwa2c1n6vi8.jpg)
![MASONRY FOR EAST SIDE COMPOUND WALL : 31-03-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Masonry-for-east-side-compound-wall-scaled-ywwv335zsjv5thka4db2tc.jpg)
![NORTH SIDE ELEVATION : 28-02-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/North-side-elevation-y7tvugfckkqrlc9klo5wjk.jpg)
![SOUTH EAST ELEVATION : 28-02-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/South-east-elevation..-y7tvfdmdgm59rrncnhhb7k.jpg)
![YARD LEVELING : 28-02-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Yard-levelling-y7tvat0r5bwl47ta2pacqo.jpg)
![GROUND FLOOR LOBBY : 28-02-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Ground-floor-lobby-y7tuta9f0k79woosi56ry8.jpg)
![FABRICATION OF WINDOW GRILLS : 28-02-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Fabrication-of-window-grills-1-y7tul48pzwymr60r74kge8.jpg)
![EXTERIOR PLASTERING COMPLETED : 31-01-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Exterior-plastering-completed-y60j6zp9yh6lc6l1p9a77k.jpg)
![FABRICATION OF WINDOW GRILLS : 31-01-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Fabrication-of-window-grills-y60j3plazg5kykxjmzhukg.jpg)
![PLUMBING WORK IN KITCHEN : 31-01-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Plumbing-work-in-kitchen-1-y60j1opqxr0d2fzw8k9jpc.jpg)
![LOBBY : 31-01-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Lobby-y60j07xxiv59u2hqgqm5mo.jpg)
![RECREATION AREA : 31-01-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Recreation-area-y60iyneev7aj88lf4xf3eo.jpg)
![ELEVATION : 30-11-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/IMG-2543-y1ojjmie18orfcqtyobbpc.jpg)
![PLUMBING KITCHEN - WORK IN PROGRESS : 30-11-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Plumbing-work-in-kitchen-y1ojeudd8egs0w4g9x10xs.jpg)
![10TH FLOOR LOBBY : 30-11-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/10th-floor-lobby-y1ojdb32znxx7jousroirk.jpg)
![RECREATION ROOM : 30-11-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Recreation-room-y1oj5xyribal96pc2zl0cg.jpg)
![MAIN STAIRCASE : 30-11-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Main-staircase-y1oiz8pvwjx1c1jgjsm2v4.jpg)
![SOUTH EAST ELEVATION : 30-11-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/South-east-elevation-y1oiv372kdmy6ba06ylszk.jpg)
![13TH FLOOR LOBBY : 30-09-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/13th-floor-lobby-y0rudypf7acxas6sneiwow.jpg)
![ELECTRICAL POINT WIRING IN PROGRESS - 12TH FLOOR : 31-10-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Electrical-point-wiring-in-12th-floor-y07fby3xs9u2at7iaaugao.jpg)
![PLUMBING WORK IN PROGRESS- 2ND FLOOR : 31-10-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Plumbing-work-in-2nd-floor..-y07f81drckv5oh72w3s2rk.jpg)
![TERRACE FLOOR : 31-08-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Terrace-floor..-xzbq5k09f0bldlp0pu05xc.jpg)
![CORE CUTTING WORK IN TOILETS : 31-08-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Core-cutting-work-in-toilets-xzbrisx2fd2mu3y9iknzls.jpg)
![7TH FLOOR LOBBY : 31-07-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/7th-floor-lobby-xzbq5k09f0bldlp0pu05xc.jpg)
![FIXING OF BALCONY HANDRAILS : 31-07-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Fixing-of-balcony-handrails-xzbrl7m718ukfkztaa8f0g.jpg)
![FIRE DUCT : 30-06-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Fire-duct-xzbrkytk4rjdw6qsbnaio0.jpg)
![INTERNAL PLASTERING - 7TH FLOOR : 30-06-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Internal-plastering-7th-floor-flats..-xzbrpi5y14g6r9451rmx34.jpg)
![CONCEALED PLUMBING WORK IN TOILETS (2nd FLOOR) : 31-05-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Concealed-plumbing-work-in-toilets-2nd-floor-xzbri8tbsjsi6cirvz32tc.jpg)
![EXTERIOR PLASTERING ON EAST SIDE IN PROGRESS : 31-05-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/East-side-elevation-xzbq5k09f0bldlp0pu05xc.jpg)
![INTERNAL PLASTERING IN 6TH FLOOR : 30-04-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Internal-plastering-in-6th-floor-xzbrpn6votrpx6z0gf15a8.jpg)
![13TH FLOOR WORK IN PROGRESS : 30-04-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/0e22c9af-fdaf-4a42-89d1-424339e21078-xzbq5k09f0bldlp0pu05xc.jpg)
![11TH FLOOR LOBBY : 31-03-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/11th-floor-lobby-xzbq5k09f0bldlp0pu05xc.jpg)
![TERRACE FLOOR WORK IN PROGRESS : 31-03-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Terrace-floor-1-xzbrrt3de88gz9rj9hnocg.jpg)
![MASONRY WORK IN 13TH FLOOR : 28-02-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/0e22c9af-fdaf-4a42-89d1-424339e21078-xzbq5k09f0bldlp0pu05xc.jpg)
![ELEVATION : 28-02-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/4a238fc3-0ee5-4a5b-a268-08a09f748b29-xzbrfds5smq3akfw1nherk.jpg)
![INTERNAL PLASTERING 4TH FLOOR IN PROGRESS : 28-02-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/f10bac8d-7a0c-46fe-97f2-10c9948c0882-xzbrkdgl30xdfxukudv1ts.jpg)
![TERRACE FLOOR : 28-02-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/f2a853c2-44d2-4da9-b6af-5ab9ec527f68-xzbrkihiqq8wlvpg919a0w.jpg)
![ELEVATION EAST SITE : 31-01-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/f6217eb9-c55a-428a-85ca-24d345147909-xzbq5k09f0bldlp0pu05xc.jpg)
![MASONRY WORK IN IN PROGRESS - 11TH FLOOR : 31-01-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/3e83d7d5-76e1-4773-afd1-7e21f70a2cb6-xzbrf68rb2qsjnnkxoe2gw.jpg)
![MASONRY WORK : 31-12-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Masonry-work-xzbrqeu0t715bv6t6zpedc.jpg)
![ELEVATION : 31-12-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Elevation..-xzbq5k09f0bldlp0pu05xc.jpg)
![ELECTRICAL POINT WIRING 4TH FLOOR FLATS : 30-11-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Electrical-point-wiring-4th-floor-flats-xzbrjltfynny19ms3t6sqo.jpg)
![TERRACE FLOOR : 30-11-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Terrace-floor-xzbrs866dc72h3c5hfucxs.jpg)
![MASONRY WORK 6TH FLOOR : 30-11-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Masonry-work-6th-floor..-xzbrq7ambn1ukyei30m22o.jpg)
![STRUCTURAL WORK FOR 13th FLOOR ROOF SLAB (TERRACE SLAB) : 31-08-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Structural-work-for-13th-floor-roof-slab-terrace-slab-xzbq5k09f0bldlp0pu05xc.jpg)
![ELECTRICAL POINT WIRING - 1st FLOOR : 31-08-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Electrical-point-wiring-1st-floor-xzbrjltfynny19ms3t6sqo.jpg)
![ELECTRICAL POINT WIRING IN FIRST FLOOR FLATS : 31-07-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Electrical-point-wiring-in-first-floor-flats-xzbq5k09f0bldlp0pu05xc.jpg)
![MASONRY WORK IN 5TH FLOOR : 31-07-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Masonry-work-in-5th-floor.-xzbq5k09f0bldlp0pu05xc.jpg)
![13TH FLOOR COLUMNS : 31-07-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/13th-floor-columns-xzbrbc11p8fniakl8t0t1c.jpg)
![CONCRETING OF TERRACE FLOOR SLAB (FIRST PORTION) COMPLETED : 31-07-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Concreting-of-terrace-floor-slab-first-portion-completed-xzbq5k09f0bldlp0pu05xc.jpg)
![EAST SIDE VIEW : 30-06-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/East-side-view-xzbrj6qmzjpcjg25vv045c.jpg)
![ELEVATION : 30-06-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/View-from-approach-road-xzbrtmfiydee4hwvjxsmww.jpg)
![MASONRY WORK IN 5TH FLOOR : 30-06-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Masonry-work-in-5th-floor-xzbrqdkse9p9jdq3cbuubk.jpg)
![12TH FLOOR ROOF SLAB CASTING COMPLETED](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/12th-floor-roof-slab-casting-completed-xzbq5k09f0bldlp0pu05xc.jpg)
![ELEVATION : 31-05-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/PHOTO-2020-06-05-16-27-17_1-xzbq5k09f0bldlp0pu05xc.jpg)
![ELECTRICAL POINT WIRING ONGOING IN 2ND FLOOR FLATS : 29-2-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Electrical-point-wiring-ongoing-in-2nd-floor-flats-1-xzbrjzn0iuanqlqoh3ixa8.jpg)
![CASTING OF 11TH FLOOR ROOF SLAB COMPLETED : 29-2-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Casting-of-11th-floor-roof-slab-completed-1-xzbq5k09f0bldlp0pu05xc.jpg)
![WEST SIDE ELEVATION : 29-2-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/West-side-elevation-1-1-xzbru1ibxhczmbhhrvzbi8.jpg)
![AS ON 31-01-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/IMG_20200129_162720-xzbrp33520hl9fjittg8hs.jpg)
![CONCRETING OF 10TH FLOOR ROOF SLAB COMPLETED [31-01-2020]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/IMG_20200129_161527-xzbrowsyzdu6b07xki7g8w.jpg)
![AS ON 31-12-2019](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/IMG_20200101_123455-xzbq5k09f0bldlp0pu05xc.jpg)
![AS ON 30-11-2019](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/IMG_20191126_122135-xzbq5k09f0bldlp0pu05xc.jpg)
![AS ON 30-11-2019](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/IMG_20191202_112027-xzbrop9khtuvk3fmgj43y8.jpg)
![REBAR CUTTING, BENDING AND TYING FOR SEVENTH FLOOR ROOF SLAB, BEAM AND COLUMNS [31-10-2019]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/IMG-20191029-WA0009-xzbrlqgp94stauyl27yrr4.jpg)
![CONCRETING OF SIXTH FLOOR COLUMNS (90% COMPLETED) [30-09-2019]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/IMG_20190921_115046-1-xzbro2nd15wzbd2p4lu328.jpg)
![REBAR CUTTING, BENDING AND TYING FOR SIXTH FLOOR ROOF SLAB, BEAM AND COLUMNS [30-09-2019]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/IMG_20190921_152513-xzbq5k09f0bldlp0pu05xc.jpg)
![CELING PLATERING - THIRD FLOOR [31-08-2019]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/IMG_20190829_094239-xzbq5k09f0bldlp0pu05xc.jpg)
![CONCRETING OF FIFTH FLOOR COLUMNS (70% COMPLETED) [31-08-2019]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/IMG_20190831_093305-xzbrnslhpr9wzhcybb1mo0.jpg)
![AS ON 31-07-2019](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/IMG_20190730_151452-xzbrnijmecmunln7i0969s.jpg)
![AS ON 31-07-2019](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/IMG_20190801_100242-xzbq5k09f0bldlp0pu05xc.jpg)
![AS ON 30-06-2019](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/IMG-20190629-WA0037-xzbrlmp00ct5xekfi8f3ls.jpg)
![AS ON 30-06-2019](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/IMG-20190629-WA0015-xzbrlho2cnhmrgpk3l0veo.jpg)
![CONCRETING OF SECOND FLOOR COLUMNS 100% COMPLETED [30-05-2019]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/FB_IMG_1559910061556-xzbrksje24vyxrf72c1qf4.jpg)
![CONCRETING OF SECOND FLOOR COLUMNS (58% -32 OUT OF 56) [30-05-2019]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/IMG_20190430_095340-xzbrnc9gbpzfp6bm8p0e0w.jpg)
![CONCRETING OF FIRST FLOOR ROOF SLAB 70% COMPLETED [30-04-2019]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/IMG_20190430_094158-xzbrn3gtf8o95s2la22hog.jpg)
![SHUTTERING WORK FOR FIRST FLOOR ROOF SLAB & BEAM 30% COMPLETED [31-03-2019]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Classic-2-xzbrhkxvwyiq54p4pdyhvk.jpg)
![CONCRETING OF GROUND FLOOR SLAB 40% COMPLETED [28-02-2019]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/IMG_20190228_092851-xzbrmjd2sfe4i0n3nghkw0.jpg)
![AS ON [31-01-2019]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/IMG_20190131_103904-xzbrmakfvy2xyme2otjojk.jpg)
![STRUCTURAL 1ST FLOOR WORK IN PROGRESS [31-01-2019]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/IMG_20190131_103725-xzbrm5ji88resoj7a65gcg.jpg)
![MAKING OF WOODEN COLUMN BOXES & STARTERS OF DIFFERENT SIZES [31-12-2018]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Making-of-wooden-column-boxes-starters-of-different-sizes-Classic-Dec-18-xzbq5k09f0bldlp0pu05xc.jpg)
![CONCRETING OF PLINTH BEAMS (30% COMPLETED) [31-12-2018]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Concreting-of-plinth-beams-completed-30-classice-dec-18-xzbrimmwcqf7vomo99f7cw.jpg)
![REBAR STRAIGHTENING & CUTTING FOR FOOTINGS & COLUMNS [30-11-2018]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/IMG_20181128_114324-xzbq5k09f0bldlp0pu05xc.jpg)
![EXCAVATION FOR FOUNDATION & FOOTING (COMPLETED 52% - 19 OUT OF 37) [30-11-2018]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/IMG_20181129_130233-xzbq5k09f0bldlp0pu05xc.jpg)
![As on [31-10-2018]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/31-10-2018-Classic-xzbrexg4elfm09ejz1g64g.jpg)
![As on 31-10-2018](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/As-on-31-11-2018-Classic-xzbrh0u5a58lhd9n2sdl34.jpg)
![EXCAVATION FOR FOOTING [30-09-2018]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Excavation-for-footing-30-10-2018-CLASSIC-xzbq5k09f0bldlp0pu05xc.jpg)
![SITE CLEARING [30-09-2018]](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/IMG_20181029_100838-xzbq5k09f0bldlp0pu05xc.jpg)