Basic Details
Land extent: | 52 cents |
No.of Floors: | B + G + 14 |
Total Flats: | 46 |
Type: | 2 Bhk (1408 Sq.ft ) 3 Bhk (1913 Sq.ft,2074 Sqft ,2092 Sq.ft) 4 Bhk (2330 Sq,ft) |
Contact
More Details : 98471 98472
About 50 Crossroads
Our new project in the segment of Uber luxury homes named "50 Crossroads" in YMCA Cross Road, Calicut. This New Ultra Luxury home from PVS Builders & Developers is all set to raise the standards of luxury living to heights never seen before. At PVS builders calicut, we understand a good design have positive impact on your lifestyle. We have put together the best team in the field of architecture in the country to creat this mile stone project. Architect of the building N.M.Salim & Associates is one of best known practices in south India with numerous known buildings to their credit. We teamed up with one of the most innovative and international award winning studio Collaborative Architecture to design and curate Interior Architecture of the project. In their previous association, the N.M.Salim & Associates designed space has won 4 international awards for its highly innovative public space design and had been widely published internationally. BUILDING PERMIT NO - TP11-BA(25246)2016 DT 24.10.2019 RERA Number: K-RERA/PRJ/119/2020
Quick Enquiry
Civil
- All RCC structure shall abide to the IS: 456 standards & the latest IS codes.
- All outside wall are in laterite masonry/solid cement block and Inside walls in single brick masonry/solid cement block.
- Covered car park in the basement & ground floor
Tiling
- Imported / Italian marble in Living Dining
- Wooden flooring in Master bed rooms
- High quality vitrified tile flooring with spacer in bedrooms, common area, Kitchen & balcony
- Slip free vitrified/high quality ceramic floor tiles with spacer in bathrooms
- Bathroom wall ceramic tiles up to false ceiling
- Granite Kitchen counter with ceramic tile dado up to 60cm height for kitchens
Kitchen
- Anti- scratch sink and tall body revolving sink mixer
- Water purifier point.
- Electrical points for washing machine, dishwasher & exhaust fan
- Adequate power points in kitchen
- Points for Kitchen sink crusher
- Telephone points in kitchen
Doors & Windows
- PU finished Imported Designer doors - 45mm thick door shutters with architrave, treated solid wood core, Acoustic seal, and Hafele or equivalent hardware
- Door stopper provided for all doors except bathroom doors
- Heavy grade electroplated aluminium sliding windows system with Ms grill
- Glass balcony railing
Painting
- All rooms with 2 coats putty Royale grade emulsion.
- External walls-2 coats of exterior emulsion over primer coat.
ELECTRICAL
- 3 Phase connection with independent KSEB meters for each apartments
- Concealed wiring using PVC conduits
- Provision for TV & telephone in living room & master bedroom
- AC point in all bedrooms
- Premium quality modular switches
- Provision for Geyser & Exhaust fan in all bathrooms.
- 24 hr stand by generator for elevators, common area & uninterrupted power supply restricted to 750W in each apartment
SANITARY /CP FITTINGS
- White color Sanitary ware - Gessi ,Villeroy & Boch. or equivalent
- Wall hung EWC with concealed cistern, press button flush.
- CP fittings - diverter/hot& cold mixer unit with shower facility, towel rod, robe hook, soap dish in all bathrooms- Gessi ,Villeroy & Boch. or equivalent
- Sensor tap at dining area
SECURITY / SAFETY FEATURES
- Standard fire safety features- extinguishers, water hose reel, fire alarm system
- Lightning arrestor
- Access controlled lobby
- Surveillance camera in the ground floor common area
WATER SUPPLY
- KWA Water /Ground water sources through sump & over head tank
Lifestyle
- Wifi enabled designer posh entrance lobby
- Vastu friendly plan
- Air-Conditioned Mini Theatre- projector & 5.1 Audio system
Safety
- Surveillance camera in the ground floor common area
- Access controlled lobby
- Video door phone
- Round the clock security
- Intercom system with connection to guard point
- Lightning arrestor
- Modern fire fighting equipment as per KBR & Kerala fire service rules
Convenience
- High speed Elevators
- 1 passenger & 1 service lift
- Glass balcony railing.
- LED lighting in common area
- Common toilet & Washroom
- Sewage Treatment Plant as per norms of Pollution control board
- Centralized gas pipe supply
- Car parking for all flats
- Exclusive car wash area
- Provision for cable/ Satellite TV.
- Roof top open party deck
- Provision for broad band internet connectivity
- Electronic PABX system
- Provision for telephone
- Provision for A/C in bedrooms
- Waste disposal system-Aerobic microbial composting of biodegradable material using biobin System
- 24 hr stand by generator for elevators, common area & uninterrupted power supply restricted to 750W in each apartment.
Recreation
- Air Conditioned fitness centre
- Swimming pool
- Kids pool
- Sauna bath
- Steam bath
- Jacuzzi
- library / Tuition Room
- Wi Fi connectivity in Library
- Association Hall / Indoor games
- Wifi enabled open party deck on terrace floor
![Optional Features](https://pvsbuilders.com/wp-content/uploads/2017/04/opt.jpg)
Optional Features
- IP camera apartment monitoring
- Smart Home Automation Customization
- Lighting Control
- Fan Control
- A/C Control
- Entrance management
- Curtain Control
- Mood lighting
- Virtual Parenting
- Kitchen
Designer kitchen, Ply carcass and PU finished ply shutters. Imported granite top, high quality Hood, Hob and soft closing drawers and shutter mechanism. - Provisions for oven and Microwave
50 Crossroads, YMCA Cross Road, Calicut
2 Available |
0 Reserved |
44 Sold |
Floor | Type-A | Type-B | Type-C | Type-D | Type-E |
1 | Sold | Sold | Sold | Available | |
2 | Sold | Sold | Sold | Sold | |
3 | Sold | Sold | Sold | Sold | |
4 | Sold | Sold | Sold | Sold | |
5 | Sold | Sold | Sold | Sold | |
6 | Sold | Sold | Sold | Sold | |
7 | Sold | Sold | Sold | Sold | |
8 | Sold | Sold | Sold | ||
9 | Sold | Sold | Sold | ||
10 | Sold | Sold | Sold | ||
11 | Sold | Sold | Sold | ||
12 | Sold | Sold | Sold | ||
13 | Sold | Sold | Available | ||
![50 Crossroads](https://pvsbuilders.com/wp-content/uploads/2017/04/location.jpg)
Easy Access
School & Colleges: | 150 mtr |
Shopping Complex: | 50 mtr |
Restaurant: | 50 mtr |
Banks & ATM: | 50 mtr |
Hospitals: | 150 mtr |
Place of Worships: | 150 mtr |
Railway Station: | 1 km |
Mananchira Park: | 350 mtr |
Bus Stand: | 200 mtr |
Beach: | 700 mtr |
Airport: | 29 Kms |
5 Star Hotel: | 400 mtr |
Locate Us
![ASSOCIATION HALL AND INDOOR GAMES](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Association-Hall-Indoor-Games-yufvs16skcbq9bm32ai8zk.jpg)
![EAST SIDE DRIVEWAY](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/East-side-driveway-yufvqcvknwhca1bm6hrim8.jpg)
![WEST SIDE DRIVEWAY](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/West-side-driveway-yufvoksnionaxamzqph43k.jpg)
![MAIN ENTRANCE](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Main-entrance-yufvm63iwsvdbtlfyzwoow.jpg)
![SWIMMING POOL](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Swimming-pool-1-ylwr2mj7w7uqxej7rgt2ww.jpg)
![JACUZZI](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Jacuzzi-1-ylwr1w5b6rx7b7s4vjzdvk.jpg)
![GYMNASIUM](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Gymnasium-ylwr0t72c2ots6dvh0o4cg.jpg)
![GROUND FLOOR LOBBY](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Ground-floor-lobby-ylwqzu0iq5g3mldrmgwiyo.jpg)
![GROUND FLOOR LOBBY ENTRY](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Ground-floor-lobby-entry-ylwqyojt1ljyil22ilw5c0.jpg)
![GROUND FLOOR LOBBY ENTRY](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Ground-floor-lobby-entry..-ylwquqke6z963rkx9qz7r4.jpg)
![ENTRY TO SWIMMING POOL](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Entry-to-swimming-pool-ylwqtil7okp9esbsgk9q0w.jpg)
![EAST SIDE YARD](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/East-side-yard-ylwqsbv9l3h8iajdi1escg.jpg)
![CORRIDOR - 14TH FLOOR](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Corridoor-14th-floor-ylwqps57bidrqvmybog4qo.jpg)
![ASSOCIATION HALL](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Association-Hall-ylwqoqg6vqha0bperszf9c.jpg)
![14TH FLOOR](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/14th-floor-1-ylwqn75wmzyf6z9tanmx34.jpg)
![14TH FLOOR LOBBY](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/14th-floor-lobby-1-ylwqjzkehtl6ecjqxpjojk.jpg)
![14th FLOOR LOBBY](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/14th-floor-lobby..-ylwqh0rj94j4542pjeeccg.jpg)
![14TH FLOOR](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/14TH-FLOOR-scaled-ywwvjzb4gnmksabud04mps.jpg)
![HOME THEATRE](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/HOME-THEATRE..-ykycqnajsyfsi4bjt7d3wg.jpg)
![ASSOCIATION - LOBBY](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/ASSOCIATION-LOBBY-ykycntim7yp9etpdtjlzwg.jpg)
![HEALTH CLUB : 31-07-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Health-Club-yhj0pmd5k833kxz6dvtx4w.jpg)
![14th FLOOR LOBBY : 30-06-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/14th-floor-lobby-yhj0ncoym1mp5esi0tnpxc.jpg)
![LOGO : 31-05-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/View-from-entrance-ydl466qf92b7x44056y3gg.jpg)
![ELEVATION : 31-05-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/East-side-elevation-ydl402uip1jog7uc39emtc.jpg)
![INTERIOR WORK IN GYM : 23-03-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Interior-work-in-gym-yalheq30snvnkza4jtz8qo.jpg)
![COBBLE STONE LAYING IN YARD : 23-03-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Cobble-stone-laying-in-yard-1-yalh5ne8zy21uujf3lafwg.jpg)
![MARKING OF CAR PARKING DEMARCATION LINE IN BASEMENT : 28-02-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Marking-of-car-parking-demarcation-lines-in-basement..-y7tx8n9grxeney27eaqrk0.jpg)
![INTERIOR WORK PROGRESSING IN ASSOCIATION HALL : 28-02-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Interior-work-progressing-in-Association-Hall-y7tx51ue2keowz88o2begw.jpg)
![FLOORING IN LIBRARY : 28-02-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Flooring-in-Library-y7tx1u8vxe1g4ci6b485xc.jpg)
![ELEVATION : 31-01-2022](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Elevation-3-y5r3dzk2ibe8xrwv1a4r28.jpg)
![FIRE STAIRCASE : 31-12-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Fire-staircase-y4bzedl0dhad8e8odda6f4.jpg)
![BASEMENT : 31-12-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Basement..-y4bzbxmnco6jufqeqzv6yo.jpg)
![LOBBY WORK IN PROGRESS : 31-12-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Lobby-y4bz0p1dujw72876hojv28.jpg)
![ENTRY TO PROJECT : 31-12-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Entry-to-project-3-y4byjhl5g45tz295l33aps.jpg)
![WATER PROOFING WORK IN PROGRESS - TERRACE FLOOR ROOFTOP : 30-11-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Waterproofing-in-terrace-floor-rooftop-y1oqfuoqps9atjhzi506ww.jpg)
![ELEVATION : 31-10-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Elevation-2-y07esgzifnnas42t0n7oqo.jpg)
![INSTALLATIONS IN FIRE DUCT : 31-08-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Installations-in-fire-duct-xzbq5k09f0bldlp0pu05xc.jpg)
![INSTALLATIONS IN FIRE PUMP ROOM : 31-08-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Installations-in-fire-pump-room-xzbq5ir102zpl48av65lvk.jpg)
![SOLAR PANEL : 31-07-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Solar-panel-for-emergency-lighting-xzbq5ir102zpl48av65lvk.jpg)
![FIRE PROOFING WORK IN DUCT : 31-07-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Fire-proofing-in-ducts-xzbq5ir102zpl48av65lvk.jpg)
![GRILL FOR COMPOUND WALL : 30-06-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Grill-for-compound-wall..-xzbq5ir102zpl48av65lvk.jpg)
![GLASS HANDRAIL WORK IN BALCONY : 30-06-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Glass-handrail-in-balcony..-xzbq5ir102zpl48av65lvk.jpg)
![FABRICATION OF COMPOUND WALL GRILL : 30-04-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Fabrication-of-compound-wall-grill-xzbq5ir102zpl48av65lvk.jpg)
![FIXING OF WINDOW GRILLS IN 14TH FLOOR AMENITIES AREA : 30-04-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Fixing-of-window-grills-in-14th-floor-amenities-area-xzbq5k09f0bldlp0pu05xc.jpg)
![YARD WORK IN PROGRESS : 31-03-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Yard-xzbq5k09f0bldlp0pu05xc.jpg)
![SECURITY CABIN WORK IN PROGRESS : 31-03-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Security-cabin-xzbq5ir102zpl48av65lvk.jpg)
![SS HANDRAIL WORK COMPLETED 2ND FLOOR TO 14TH FLOOR : 28-02-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/3d7f3ca1-ed74-40a2-8d53-0be6305f1409-xzbq5ir102zpl48av65lvk.jpg)
![PLUMBING WORK IN 14TH FLOOR : 28-02-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/ce8ab904-7f2a-4546-b119-80aab6c8537a-xzbq5k09f0bldlp0pu05xc.jpg)
![BALCONY HANDRAIL FIXING IN PROGRESS : 31-01-2021](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/aeb32c0b-e6b3-4f07-8711-e1d25b6cf229-xzbq5ir102zpl48av65lvk.jpg)
![LIFT CLADDING : 31-12-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Lift-cladding-xzbq5k09f0bldlp0pu05xc.jpg)
![PLUMBING WORK IN GROUND FLOOR IN PROGRESS : 31-12-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Plumbing-work-in-ground-floor-in-progress-xzbq5k09f0bldlp0pu05xc.jpg)
![ELEVATION : 31-12-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/IMG_6096-xzbq5ir102zpl48av65lvk.jpg)
![SECURITY CABIN : 31-12-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/a9476c14-8e51-454f-86c6-7f87e0391418-xzbq5ir102zpl48av65lvk.jpg)
![LOBBY FLOORING : 30-11-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Lobby-flooring-xzbq5ir102zpl48av65lvk.jpg)
![LIFT CLADDING WORK IN PROGRESS : 30-11-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Lift-cladding-work-in-progress-xzbq5ir102zpl48av65lvk.jpg)
![FIRE STAIRCASE FLOORING IN PROGRESS : 30-11-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Fire-staircase-flooring-in-progress-xzbq5k09f0bldlp0pu05xc.jpeg)
![ELEVATION : 31-10-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Elevation-1-xzbq5k09f0bldlp0pu05xc.jpg)
![MAIN STAIRCASE HANDRAIL : 31-10-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Main-staircase-handrail-xzbq5k09f0bldlp0pu05xc.jpg)
![DIESEL GENERATOR : 31-08-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Diesel-generator-xzbq5k09f0bldlp0pu05xc.jpg)
![ELEVATION : 31-08-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Elevation2-1-xzbq5k09f0bldlp0pu05xc.jpg)
![ELEVATION : 31-07-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Elevation-xzbq5ir102zpl48av65lvk.jpg)
![FOUNDATION FOR DIESEL GENERATOR IN BASEMENT : 31-07-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Foundation-for-Diesel-Generator-in-basement-xzbq5ir102zpl48av65lvk.jpg)
![ELEVATION : 31-07-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Elevation4-xzbq5ir102zpl48av65lvk.jpg)
![PLUMBING WORK AT GROUND FLOOR : 30-06-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Plumbing-work-at-ground-floor-xzbq5ir102zpl48av65lvk.jpg)
![EXTERIOR PAINTING WORK IN PROGRESS : 31-05-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/PHOTO-2020-06-04-16-37-18-xzbq5k09f0bldlp0pu05xc.jpg)
![TILING IN TOILET : 29-2-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Tiling-in-toilet-4-xzbq5ir102zpl48av65lvk.jpg)
![FLAT NO.2C : 29-2-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/50CR-Flat-2C-2-xzbq5ir102zpl48av65lvk.jpg)
![FLAT NO. 2C : 29-2-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/50CR-Flat-2C-xzbq5ir102zpl48av65lvk.jpg)
![ELEVATION 29-2-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/50CR-2-xzbq5ir102zpl48av65lvk.jpg)
![MARBLE FLOORING WORK IN PROGRESS - 31-01-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Marble-flooring-xzbq5k09f0bldlp0pu05xc.jpg)
![TOILET TILING - WORK IN PROGRESS 31-01-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Tiling-in-toilet-xzbq5k09f0bldlp0pu05xc.jpg)
![EXTERIOR PAINTING IN PROGRESS 31-01-2020](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Exterior-painting-xzbq5ir102zpl48av65lvk.jpg)
![EXTERIOR PAINTING - WORK IN PROGRESS 31-12-2019](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Exterior-painting-in-progress-1-xzbq5k09f0bldlp0pu05xc.jpg)
![ELEVATION AS ON 31-10-2019](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/WhatsApp-Image-2019-07-31-at-10.12.34-xzbq5ir102zpl48av65lvk.jpeg)
![MOCK UP FLAT - BALCONY](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/04V7428-xzbq5ir102zpl48av65lvk.jpg)
![MOCK UP FLAT - WORK AREA](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/04V7426-copy-xzbq5k09f0bldlp0pu05xc.jpg)
![MOCK UP FLAT - KITCHEN](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/04V7416-copy-xzbq5ir102zpl48av65lvk.jpg)
![MOCK UP FLAT - BED ROOM](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/04V7397-copy-xzbq5ir102zpl48av65lvk.jpg)
![MOCK UP FLAT - BED ROOM](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/04V7386-copy-xzbq5ir102zpl48av65lvk.jpg)
![MOCK UP FLAT - BED ROOM](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/04V7377-copy-xzbq5k09f0bldlp0pu05xc.jpg)
![MOCK UP FLAT - BED ROOM](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/04V7350-copy-xzbq5k09f0bldlp0pu05xc.jpg)
![MOCK UP FLAT](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/04V7330-copy-xzbq5k09f0bldlp0pu05xc.jpg)
![MOCK UP FLAT - LIVING / DINNING AREA](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/04V7322-copy-xzbq5k09f0bldlp0pu05xc.jpg)
![MOCK UP FLAT - WASH AREA](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/04V7309-copy-xzbq5ir102zpl48av65lvk.jpg)
![MOCK UP FLAT - LIVING ROOM](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/04V7305-copy-xzbq5ir102zpl48av65lvk.jpg)
![MOCK UP FLAT - BED ROOM 1](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/04V7297-copy-xzbq5k09f0bldlp0pu05xc.jpg)
![AS ON 30-06-2019](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/WhatsApp-Image-2019-06-29-at-10.57.17-xzbq5ir102zpl48av65lvk.jpeg)
![ELEVATION AS ON 31-05-2019](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/FB_IMG_1559910036749-xzbq5ir102zpl48av65lvk.jpg)
![MOCK FLAT AS ON 31-05-2019](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/WhatsApp-Image-2019-04-30-at-11.57.36-2-xzbq5ir102zpl48av65lvk.jpeg)
![MOCK FLAT AS ON 31-05-2019](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/WhatsApp-Image-2019-04-30-at-11.57.35-xzbq5k09f0bldlp0pu05xc.jpeg)
![MOCK FLAT AS ON 31-05-2019](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/WhatsApp-Image-2019-04-30-at-11.57.35-3-xzbq5k09f0bldlp0pu05xc.jpeg)
![COMPOUND WALL WORK IN PROGRESS 31-03-2019](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/WhatsApp-Image-2019-03-29-at-09.12.18-xzbq5ir102zpl48av65lvk.jpeg)
![AS ON 31-03-2019](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/WhatsApp-Image-2019-02-27-at-11.00.59-2-xzbq5ir102zpl48av65lvk.jpeg)
![CARPENTRY WORK IN PROGRESS 28-02-2019](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/WhatsApp-Image-2019-02-25-at-14.52.00-xzbq5k09f0bldlp0pu05xc.jpeg)
![AS ON 28-02-2019](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/WhatsApp-Image-2019-02-27-at-11.00.58-4-xzbq5k09f0bldlp0pu05xc.jpeg)
![As on 31-01-2019](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/WhatsApp-Image-2019-02-01-at-13.03.07-2-xzbq5k09f0bldlp0pu05xc.jpeg)
![As on 31-01-2019](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/WhatsApp-Image-2019-01-31-at-10.03.33-xzbq5k09f0bldlp0pu05xc.jpeg)
![As on 31-01-2019](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/WhatsApp-Image-2019-02-01-at-09.17.47-xzbq5k09f0bldlp0pu05xc.jpeg)
![AS ON 31-12-2018](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/WhatsApp-Image-2018-12-18-at-16.25.56-2-xzbq5ir102zpl48av65lvk.jpeg)
![1F INTERNAL PLASTERING - 75% COMPLETED 31-10-2018](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/1F-internal-plastering-75-completed-31-10-2018-50CR-xzbq5ir102zpl48av65lvk.jpeg)
![8TH FLOOR INTERNAL PLASTERING STARTED : 30-09-2018](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/8FLOOR-internal-plastering-Started-30-9-2018-xzbq5ir102zpl48av65lvk.jpg)
![INTERNAL PLASTERING UP TO 5TH FLOOR & ELECTRICAL METAL BOX FIXING & POINT WIRING UP TO 6TH FLOOR COMPLETED: 30-08-2018](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/right-side-view-xzbq5ir102zpl48av65lvk.jpg)
![4TH FLOOR INTERNAL PLASTERING - 40% COMPLETED: 30-7-2018](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/4F-internal-plastering-40-completed-30-7-2018-50cr-xzbq5ir102zpl48av65lvk.jpg)
![EXTERNAL PLASTERING RIGHT SIDE UP TO 7TH FLOOR- 100% COMPLETED : 30-07-2018](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/External-Plastering-Right-Side-Upto-7th-floor-100-completed-30-7-2018-50CR-xzbq5k09f0bldlp0pu05xc.jpg)
![PLUMBING WORK- 3RD FLOOR -50% COMPLETED : 30-7-2018](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Plumbing-Work-3rd-F-50-completed-30-7-2018-50cr-xzbq5ir102zpl48av65lvk.jpg)
![MOCK UP FLAT - PLASTERING, ALUMINIUM WINDOW FIXING, GRILL FIXING COMPLETED : 30-06-2018](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/50-CR-30-6-2018-xzbq5ir102zpl48av65lvk.jpg)
![EXTERNAL PLASTERING 10% COMPLETED : 30-06-2018](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/External-Plastering-10-completed-30-6-2018-50-cr-xzbq5ir102zpl48av65lvk.jpg)
![STRUCTURE COMPLETED : 31-05-2018](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Structure-Completed-31-05-2018-xzbq5ir102zpl48av65lvk.jpeg)
![PLUMBING WORK STARTED : 31-05-2018](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Plumbing-Started-31-5-2018-xzbq5ir102zpl48av65lvk.jpeg)
![PLASTERING MOCKUP FLAT COMPLETED : 31-05-2018](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Plastering-Mockup-50-CR-Completed-31-5-2018-xzbq5k09f0bldlp0pu05xc.jpeg)
![TERRACE FLOOR SHUTTERING WORK IN PROGRESS 01-05-2018](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Terrace-floor-shuttering-work-in-progress-1-5-2018-xzbq5ir102zpl48av65lvk.jpeg)
![As on March 2018](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/50cr-march-2018-xzbq5ir102zpl48av65lvk.jpeg)
![13th FLOOR STRUCTURAL WORK : 10-03-2018](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/structural-13th-floor-50-cr-march-2018-xzbq5k09f0bldlp0pu05xc.jpeg)
![CEILING PLASTERING COMPLETED UP TO 7TH FLOOR 10-02-2018](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Ceiling-plastering-completed-upto-7th-floor-10-2-18-50-cr-xzbq5ir102zpl48av65lvk.jpeg)
![MASONRY UPTO 6TH FLOOR 90% COMPLETED 10-02-2018](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Masonry-upto-6th-floor-almost-completed-50-cr-10-2-18-xzbq5ir102zpl48av65lvk.jpeg)
![8TH FLOOR SLAB CONCRETING COMPLETED 10-02-2018](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/8th-floor-slab-concreting-completed-50-cr-10-2-18-xzbq5k09f0bldlp0pu05xc.jpeg)
![RCC FOR SIXTH SLAB 50 % COMPLETED - 01.12.2017](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/RCC-for-6F-SLAB-50-Completed-1-12-17-xzbq5k09f0bldlp0pu05xc.jpeg)
![SECOND FLOOR SLAB CASTING COMPLETED - 17.10.2017](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Second-floor-slab-casting-of-50-crossroads-project-has-been-completed-on-201017-1-xzbq5ir102zpl48av65lvk.jpeg)
![FIRST FLOOR SLAB CASTING - COMPLETED 06.10.2017](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/First-floor-slab-casting-of-50-crossroads-project-has-completed-on-061017.-xzbq5ir102zpl48av65lvk.jpeg)
![RCC FOR THIRD FLOOR SLAB - 30 % COMPLETED 01.09.2017](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/RCC-for-3-F-SLAB-30-Completed-50-CR-xzbq5k09f0bldlp0pu05xc.jpg)
![SHUTTERING WORK FOR SF SLAB - 75% COMPLETED 01.08.17](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/Shuttering-work-for-SF-slab-75-Completed-1-8-17-xzbq5ir102zpl48av65lvk.jpg)
![RCC FOR PLINT BEAM & BASEMENT SLAB - 90% COMPLETED 01.08.17](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/RCC-for-Plinth-beam-Basement-slab-90-completed.-1-8-17-xzbq5k09f0bldlp0pu05xc.jpg)
![CURRENT STATUS ON 30.06.17](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/CURRENT-STATUS-ON-30.06.17-1-xzbq5ir102zpl48av65lvk.jpg)
![WORK STATUS AS ON 31.05.17](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/WORK-STATUS-AS-ON-31.05.17-xzbq5ir102zpl48av65lvk.jpg)
![WORK STATUS AS ON 31.04.17](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/50-cross-roads-current-status-30.04.17--xzbq5k09f0bldlp0pu05xc.jpg)
![WORK STATUS AS ON 31.03.2017](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/cur_5-xzbq5k09f0bldlp0pu05xc.jpg)
![PILE LOAD TEST AS ON 28.02.2017](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/cur_4-xzbq5k09f0bldlp0pu05xc.jpg)
![PILING WORK COMPLETED ON 16.01.2017](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/cur_3-xzbq5k09f0bldlp0pu05xc.jpg)
![PILING WORK PROGRESS 31.10.2016](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/cur_1-xzbq5ir102zpl48av65lvk.jpg)
![PILING WORK PROGRESS 31.10.2016](https://pvsbuilders.com/wp-content/uploads/bfi_thumb/cur_2-xzbq5ir102zpl48av65lvk.jpg)