PVS platinum -The platinum edge in fine living, A close knit community of 40 dream apartments tucked in a calm serene locale at Melechovva, Kannur. The elegant facade of this apartment is a reflection of the brilliantly detailed interior spaces.The spaces that promise a cosy, hassle free living in the heart of Kannur town.
The intelligently designed spaces offer scope for ample sunlight and ventilation, When It comes to the amenities and privileges, meticulous and painstaking effort has gone into offering the best of the occupants. Every home is built around with the needs, aspirations and dreams of a discerning home seeker.
Dedicated lobby
Vastu friendly plan
AC Mini Theatre
Audio system
Exquisitely landscaped area
A/C Fitness centre
Children's play area
Caretaker's room
Indoor games
Wi-Fi enabled Reading room
All round compound walls
surrounding the community
Lightning arrestor
Guard room for 24 hr security
Fire fighting & Control system
High speed Elevators
1 passenger & 1 stretcher lift
Backup generator for lifts/
light in each apartments
Roof top party area/ garden
Car parking for all flats
Exclusive car wash area
Sewage Treatment Plant
Rain water harvesting
General store
Driver's rest room
Provision for A/C
Electronic PABX system
Provision for telephone
Common toilet & Washroom
KITCHEN
Granite kitchen counter with ceramic tile dado up to 2 feet
Stainless steel sinks with drain board
Water purifier point & exhaust fan points
Adequate power points in kitchen
Washing machine point & additional working table with Granite top at work area
WATER SUPPLY
Pure Water From groundwater sources
Bore well /KWA water in adequate quantity
DOORS AND WINDOWS
Teak wood main door with melamine finish
All door frames in hardwood
Modular internal doors with putty & enamel finish
Powder coated aluminium windows
High quality joinery & accessories
FLOORING
High quality vitrified flooring with spacer-RAK/ Johnson or equivalent
Anti -skid ceramic floor tiles with spacer in bathrooms & balcony- Kajaria/ Johnson or equivalent
SECURITY/SAFETY FEATURES
Surveillance camera in the common area
Round the clock security
Intercom system with connection to guard point
Standard fire safety features
Lightning arrestor
SANITARY FITTINGS
Sanitary ware of premium make-parry ware/ Hind ware or equivalent
Premium quality CP bath fittings with mixers, shower, towel rod & soap dish - jaguar or equivalent
ELECTRICAL
3 Phase connection with independent KSEB meters for each apartments
Concealed wiring using PVC conduits
AC point in all bedrooms
Modular switches- ABB/ Legrand or equivalent
Geyser & Exhaust fan points in all bathrooms
24 hr standby generator for elevators, common area & uninterrupted power supply restricted to 750W for 2 BHK & 1000W for 3 BHK
DB, MCB, ELCB-ABB / Legrand / equivalent
CIVIL
All RCC works as per IS: 456
All outside wall are in laterite / cement block masonry
Inside walls in single brick masonry
PAINTING
All rooms with 2 coats putty emulsion
External walls-2 coats of exterior emulsion over primer coat
Near Mele Chovva Junction
Thalassery Road
Kannur-670006
FRONT VIEW 02.01.17
CURRENT POSITION AS ON 02.02.2017
CURRENT POSITION AS ON 01.04.2017
CURRENT STATUS AS ON 02.05.17
DOOR POLISH WORK COMPLETED 1-8-17
SOLAR PANEL WORK COMPLETED 01.08.17
GROUND FLOOR LIGHT FIXING WORK COMPLETED 01-10-2017
CCTV 80% WORK COMPLETED [01-11-2017]
AS ON 01-11-2017
INTER LOCK WORK 50% COMPLETED [01-11-2017]
First Floor
Second Floor
Third Floor
Fourth Floor
Eighth Floor
Twelth Floor
Thirteenth Floor
First Floor
Second Floor
Third Floor
Fourth Floor
Fifth Floor
Sixth Floor
Eighth Floor
Ninth Floor
Tenth Floor
First Floor
Fourth Floor
Fifth Floor
Sixth Floor
Seventh Floor
Tenth Floor
Eleventh Floor
Thirteenth Floor
Fourteenth Floor
Location
Near Mele Chovva Junction
Thalassery Road
Kannur-670006
Current Status
FRONT VIEW 02.01.17
CURRENT POSITION AS ON 02.02.2017
CURRENT POSITION AS ON 01.04.2017
CURRENT STATUS AS ON 02.05.17
DOOR POLISH WORK COMPLETED 1-8-17
SOLAR PANEL WORK COMPLETED 01.08.17
GROUND FLOOR LIGHT FIXING WORK COMPLETED 01-10-2017
CCTV 80% WORK COMPLETED [01-11-2017]
AS ON 01-11-2017
INTER LOCK WORK 50% COMPLETED [01-11-2017]
Availability
First Floor
Second Floor
Third Floor
Fourth Floor
Eighth Floor
Twelth Floor
Thirteenth Floor
First Floor
Second Floor
Third Floor
Fourth Floor
Fifth Floor
Sixth Floor
Eighth Floor
Ninth Floor
Tenth Floor
First Floor
Fourth Floor
Fifth Floor
Sixth Floor
Seventh Floor
Tenth Floor
Eleventh Floor
Thirteenth Floor
Fourteenth Floor