PVS Emerald
Pokkunnu, Calicut

  • Overview
  • floor plans
  • Specifications
  • Amenities
  • Availability
  • Location
  • Current status

Basic Details

Land Extent : 1.02 Acres
No of Towers : 2
No of Floors : B+G+14
Total Flats : 112
Types : 2 Bhk (1081 sqft -1147 sqft)
3 Bhk (1521 sqft - 1592 sqft)
  • PVS EMERALD - AERIAL VIEW

PVS Emerald, Premium Apartments

Emerald Apartments are situated in emerald verdant surroundings. The fresh air from the nearby Botanical Garden and the expert designing and layout of the 2/3 BHK flats make it an optimum utilization of the available space and your money. This premium Apartments are close to the Airport and Bypass, Educational institutions, places of worship, Hospital facility and the Cyber Park close by ensures ease of living and a high degree of comfort. Choose from 112 - 2 BHK & 3 BHK - apartments spread in 16 floors of twin towers .

At Emerald you are not only choosing a home, you are choosing a lifestyle. You get a lobby for your visitors, elevators, wifi enabled library and recreation centres. Centralised gas distribution takes the pressure of finding kitchen fuel out of your mind. Round the clock security mean that your tiny tots, aged Parents and young kids are safe at home when you are away at work. Fitness centre to burn some flab and 24 hour generator provide electricity while rain water harvesting makes you a responsible citizen. Join the Emerald advantage.

BUILDING PERMIT NO - E/TP6/E2/16418/08 DT 18.03.2017

Quick Enquiry

CIVIL

  • All RCC Works as per IS 456
  • Laterite masonry for outside walls
  • Single brick masonry for Inside walls

FLOORING

  • High quality vitrified flooring RAK/Johnson or equivalent
  • Anti skid ceramic floor tiles Kajaria/Johnson or equivalent in bathroom and balcony

KITCHEN

  • Granite kitchen counter with ceramic tile dado up to 2ft
  • Stainless steel sink with drain board
  • Water purifier point
  • Washing machine and exhaust fan points
  • Adequate power points in kitchen

DOORS AND WINDOWS

  • Teak Wood main door with melamine finish
  • Door frames in hardwood
  • Modular internal doors with putty & enamel finish
  • Powder coated aluminium windows
  • High quality joinery & accessories

PAINTING

  • All rooms with 2 coats putty emulsion
  • External walls 2 coats of exterior emulsion over primer coat

ELECTRICAL

  • 3 phase connection with independent KSEB meter for each apartment
  • Concealed wiring using PVC conduits
  • Provision for TV & telephone in living room & master bedroom
  • AC points in all bedrooms
  • Modular switches ABB/Legrand or equivalent
  • Wires-Finolex / RR or equivalent
  • Geyser and exhaust fan points in all bathrooms
  • 24 Hrs standby generator for Lifts, common area,& uninterrupted power supply restricted to 750 W per flat.DB,MCB,ELCB-ABB/Legrand/equivalent

SANITARY FITTINGS

  • Sanitary ware of premium make paryware/hindware or equivalent
  • Premium quality CP bath fittings with mixers, showers, towel rod and soap dish - Jaguar or equivalent

SECURITY/SAFETY FEATURES

  • Surveillance camera in the common area
  • Round the clock security
  • Intercom system with connection to guard point
  • Standard fire safety features
  • Lightning arrestor

WATER SUPPLY

  • Ground Water Sources
  • Bore Well/ KWA water in adequate quantity

Lifestyle

  • Dedicated lobby for each tower
  • Vastu friendly plan
  • AC Mini Theatre projector & 5.1 Audio system/ Association Room
  • Exquisitely landscaped areas

Recreation

  • Swimming Pool
  • Kids Pool
  • Sauna and Steam
  • Jacuzzi
  • AC Fitness Centre
  • Meditation Hall
  • Children's Play Area
  • Jogging Track
  • )Open Badminton Court
  • Semi - Basket ball court
  • Cricket Bowling Machine
  • Wifi enabled Library and Reading room
  • Caretaker's Room
  • Billiards Table
  • Table Tennis

Safety

  • Guardroom for 24 Hour Security
  • All round compound walls surrounding the community
  • Fire Fighting & Control System
  • Lightning Arrestor
  • Surveillance camera in the common area

Convenience

  • High Speed Elevators
  • Passenger and Stretcher Lift for each tower
  • Back up Generator for lifts/Light loads Up to 750W in each apartments)
  • Centralized Gas Supply
  • Drivers Restroom
  • Common Toilets and Washrooms
  • STP
  • Rain Water Harvesting
  • Car Parking for all flats
  • Exclusive Car Wash Area
  • Provision for cable/satellite tv
  • Roof Top Party Area/Garden
  • Broadband internet Connectivity
  • Electronic PABX system
  • Provision for Telephone
  • Provision for AC
  • General Store
  • sewage Treatment plant

PVS Emerald, Premium Apartments, Pokkunnu, Calicut
Tower - A

Available
Reserved
Sold

 

Floor Type - A Type -B Type - C Type - D
1 Available Available Available Available
2 Available Sold Sold Available
3 Reserved Available Available Sold
4 Reserved Sold Sold Sold
5 Sold Sold Sold Sold
6 Sold Sold Sold Sold
7 Sold Sold Sold Sold
8 Sold Sold Sold Sold
9 Sold Sold Sold Sold
10 Sold Sold Sold Sold
11 Sold Sold Sold Sold
12 Sold Sold Sold Sold
13 Sold Sold Sold Sold
14 Sold Sold Sold Sold

 

PVS Emerald, Premium Apartments, Pokkunnu, Calicut
Tower - B

Available
Reserved
Sold

 

Floor Type - A Type -B Type - C Type - D
1 Reserved Available Sold Available
2 Available Available Available Available
3 Available Available Available Available
4 Reserved Sold Available Available
5 Available Sold Sold Sold
6 Sold Reserved Available Reserved
7 Sold Sold Sold Sold
8 Reserved Sold Sold Available
9 Sold Sold Sold Sold
10 Reserved Sold Sold Sold
11 Sold Sold Sold Sold
12 Sold Sold Sold Sold
13 Sold Sold Available Sold
14 Reserved Available Sold Reserved
PVS Emerald

Easy Access

Kinasserry Mini Township 300 mtr
Places for worship 500 mtr
Guruvayurappan Collage 800 mtr
Malabar Botanical Garden 1.5 km
Mini Byepass (Mankavu) 2.3 km
Hospital (MIMS) 3.6 km
Kozhikode Byepass (Pantheerankavu) 3.9 km
Calicut Railway station 5.2 km
Moffusel Bus stand 6 km
KSRTC 6.5 km
Airport 22 km

Locate Us

Ground floor RCC Slab & beam (50% completed on 26-08-2016) Tower B Ground floor RCC Slab & beam (50% completed on 26-08-2016) Tower B
Basement Floor Laterite Masonry Work is in Progress (Sept 2016 Basement Floor Laterite Masonry Work is in Progress (Sept 2016
Tower B-basement floor structure has been completed on (3-9-2016)2 Tower B-basement floor structure has been completed on (3-9-2016)2
Second floor structural work has been successfully completed (on 17-10-2016) Second floor structural work has been successfully completed (on 17-10-2016)
Fourth Floor RCC Columns Completed (01-11-2016) Fourth Floor RCC Columns Completed (01-11-2016)
First Floor Laterite Masonry Work is progressing (Nov 2016) Tower B First Floor Laterite Masonry Work is progressing (Nov 2016) Tower B
TOWER B 6TH FLOOR COMPLETED 02.01.17 TOWER B 6TH FLOOR COMPLETED 02.01.17
B TOWER 7TH FLOOR COMPLETED 05.01.2017 B TOWER 7TH FLOOR COMPLETED 05.01.2017
8TH FLOOR COMPLETED ON 27.01.2017 8TH FLOOR COMPLETED ON 27.01.2017
TOWER B 9TH FLOOR WORK COMPLETED AS ON 03/02/2017 TOWER B 9TH FLOOR WORK COMPLETED AS ON 03/02/2017
concreting of 10th floor Tower B on Completed on21/2/2017 concreting of 10th floor Tower B on Completed on21/2/2017
STATUS AS ON 28.02.2017 STATUS AS ON 28.02.2017
B TOWER 11TH FLOOR WORK COMPLETED ON 09.03.2017 B TOWER 11TH FLOOR WORK COMPLETED ON 09.03.2017
B TOWER 12 FLOOR ROOF SLAB WORK COMPLETED ON 23.03.17 B TOWER 12 FLOOR ROOF SLAB WORK COMPLETED ON 23.03.17
B TOWER CURRENT POSITION ON 01.04.2017 B TOWER CURRENT POSITION ON 01.04.2017
B TOWER CONCRETING OF 13TH FLOOR ROOF SLAB COMPLETED ON 08/04/2017 B TOWER CONCRETING OF 13TH FLOOR ROOF SLAB COMPLETED ON 08/04/2017
TOWER B CURRENT STATUE AS ON 01.05.17 TOWER B CURRENT STATUE AS ON 01.05.17
TOWER A PILECAP WORK AS ON 01.05.17 TOWER A PILECAP WORK AS ON 01.05.17
TOWER B 14TH FLOOR ROOF SLAB CONCRETING COMPLETED ON 12.05.17 TOWER B 14TH FLOOR ROOF SLAB CONCRETING COMPLETED ON 12.05.17
TOWER  A CURRENT STATUS  ON 01.06.2017 TOWER A CURRENT STATUS ON 01.06.2017
TOWER -  A  CURRENT STATUS  ON 29.06.17 TOWER - A CURRENT STATUS ON 29.06.17
TOWE - A   GROUND FLOOR STRUCTURAL WORK COMPLETED  ON 21.07.17 TOWE - A GROUND FLOOR STRUCTURAL WORK COMPLETED ON 21.07.17
TOWER -A : FIRST FLOOR STRUCTURAL WORK COMPLETED ON 05.08.2017 TOWER -A : FIRST FLOOR STRUCTURAL WORK COMPLETED ON 05.08.2017
TOWER-A : SECOND FLOOR STRUCTURAL WORK COMPLETED ON 17.08.2017 TOWER-A : SECOND FLOOR STRUCTURAL WORK COMPLETED ON 17.08.2017