Ongoing Project

PVS Green Valley, Chala, Kannur

BHOOMIPOOJA ON 26.06.15
FOUNDATION STAGE 26.06.15
FOUNDATION STONE LAYING BY P.V. CHANDRAN ,KTC GROUP CHAIRMAN 26.06.15
P.V .GANGADHARAN MG.PARTNER ADDRESSING THE AUDIENCE 26.06.15
P.V.CHANDRAN,KTC GROUP CHAIRMAN ADDRESSING THE GATHERING 26.06.15
FLOOR SLAB WORK 01.09.15
WORK IN FULL SWING 35% STRUCTURE COMPLETED 12/10/15
WORK IN FULL SWING 35% STRUCTURE COMPLETED 12/10/15
BACKSIDE VIEW OF BLOCK A &B 07/11/15
3RD FLOOR STRUCTURAL WORK COMPLETED ON 02.12.15
STRUCTURAL WORK AT B BLOCK COMPLETED 27.12.15
STRUCTURAL GROUND FLOOR COMPLETION ON 06/01/2016
BLOCK A FRONT VIEW AS ON 04/02/2016
BLOCK C STRUCTURAL SECOND FLOOR COMPLETED - 04/02/2016
STRUCTURAL WORK OF 3 RD FLOOR C BLOCK COMPLETED- 09-03-16
C BLOCK WATER TANK CONSTRUCTION ON 06/04/2016
Block A: Plumbing- internal concealed plumbing work and wasteline pipe laying completed from ground to second floor; work in third floor in progress 7-5-16
08-06-2016
Block A - Fixing of staircase handrail- completed 3-8-16
Block B- Fabrication and fixing of grills and balcony handrails is nearing completion 3-9-16
Block C - Fabrication of sliding aluminium windows is in progress (Sept 2016)
Block A - Exterior painting (base coat) (Sept 2016)
Block A - Exterior painting (base coat) (Sept 2016)
Shuttering for cover slab of STP (Oct 2016)
Block B - East side elevation (Oct 2016)
false ceiling in toilet (Nov 2016)
Interior Painting - (Nov 2016)
STP (Nov 2016)
Block B- south side view (Nov 2016)
POSITION OF BLOCK B AS ON 02.01.2017
POSITION OF BLOCK C AS ON 02.01.2017
CURRENT POSITION AS ON 02.02.2017
BLOCK A CURRENT STATUS ON 04.05.17
BLOCK C CURRENT STATUS ON 04.05.17